ATS Chat Moss Signal Patch

  • by oli0304
  • 1 upvote
  • Downloaded 55 times

This patch adds Approach Control signalling on the Alan Thompson Simulation 'Chat Moss' route, where it wasn't already implemented before. Please note that no signals have been replaced so installation of this patch will not have any impact on existing scenarios, this purely utilises the Armstrong Powerhouse Signal Enhancement Pack to add realistic signalling to the route.

This patch includes:

  • Approach Control at Edge Hill West Junction when approaching from the Down Chat Moss, for when crossing onto the Down Ditton Fast
  • Approach Control in the Earlestown Area, approaching from all three sides of the triangle.
  • Approach Control at Winwick and Dallam Junctions for the short stretch up to Warrington Bank Quay on the WCML
  • Added missing AWS Magnets on the Up & Down Ordsall Chord aswell as Water Street Junction

Requirements

Installation Instructions

  • To install this patch, simply drag and drop the 'Content' folder provided into your Railworks directory and overwrite any files as requested. This is normally located at C:\Program Files (x86)\Steam\steamapps\common\RailWorks.
  • It is recommended that you do a backup of your route prior to installation, I am not held responsible for any damage if any that this causes to your Train Sim Classic Installation.

Files

ChatMossSignalPatch.zip 888 KB · Added 2 days ago · Downloaded 55×

Comments

Nobody has commented yet.

Add a comment

If you wish to leave a comment, please log in .

About this mod

Created
2 days ago
Updated
2 days ago
Game
Train Simulator Classic
Type of content
Patch